ADVANCED TECHNOLOGY     LIFE SCIENCES     CORPORATE OFFICES & HIGH-END INTERIORS     > SUSTAINABLE & SPECIALIZED FACILITIES

SUSTAINABLE & SPECIALIZED FACILITIES

Technical Builders can tackle many diverse projects. We:

  • are well-versed in green building practices, including solar power system installation and implementation of strategies for LEED certification
  • complete seismic retrofits, bringing older and historical buildings up to current code
  • work with restaurants, food manufacturers, and food processors, applying our understanding of local health and FDA regulations to eliminate potential regulatory problems at the design stage
  • deliver turnkey retail construction projects, whether building out a mall space or developing a strip mall from ground up

The following are some of our Specialty, Retail & Green projects:

  • Skystream Networks - New building and interior renovation totaling 55,000 SF. Project included new 10,000 SF mezzanine and 7,000 SF of new 2-story ground up building addition, a full seismic upgrade and new "Class A" interior improvements. Project was completed in 22 weeks.

  • Opti Solar - Construction of a new Solar Pilot Plant including new Chemical Storage bunker, specialized piping systems and power distribution, and exhaust systems.

  • Taryn Rose at Santana Row - Construction of a high end retail shoe store at Santana Row. Project included limestone floors, curved walls and ceilings with level 5 finish and custom waterfall feature.

  • 825 Stewart Drive, Sunnyvale - Project included Demolition of an existing 20,000 SF tilt-up building and construction of a new ground up 35,000 SF office building. Project also included seismic upgrade, the addition of 15 new exterior window openings, all new storefront glass, new 2 story lobby, and new roof.

  • 960 San Antonio, Palo Alto - Completely re-built existing 12,000 SF building including new raised first and second floors and roof in an existing 2-story concrete tilt up. Project included all new exterior openings, new 2-story lobby, new restroom core and elevator.

  • Chinese Mutual Assistance Association - Design build construction of a new ground up 22,000 SF office building, including extensive site-work, underground parking for 30 cars, and all interior improvements.

  • Hoya Optics - Design build construction of a 30,000 SF two story steel framed building for the manufacture of optical quality glass. Project included 16,000 amps of electrical distribution, and a second floor capable of holding extremely heavy loads.

  • Nanogram - Seismic upgrade to a 78,000 SF building. Project included new wall anchors, re-nailing of the roof diaphragm, new steel brace frames with grade beams and tube steel reinforcing of existing concrete wall panels.

  • Mary Manor Retail Center - New ground up retail Center for tenants including Starbucks, Curves, Quiznos, dry cleaners and spec space.

  • Peninsula Beauty Supply - Interior improvement of a 4,000 SF retail space in Willow Glen area of San Jose. Project included salon area, mezzanine area for new offices and retail sales area including installation of slat wall and fixtures.

  • Dream Dinners San Jose & Los Gatos – Design build construction of 2 stores including kitchen and prep areas for food preparation and packaging.



HOME      WHY US       SERVICES       PROJECTS       NEWS       CONTACT      SITE MAP 
310 W. Hamilton Avenue, Campbell, California 95008 P: 408.378.6500 © Copyright 2009 Technical Builders. All rights reserved.