ADVANCED TECHNOLOGY

As our company name implies, technical projects have been our mainstay since we launched the company in 1992. Our expertise includes clean rooms, research and development labs, data centers, semiconductor fabrication facilities, and more.

We have completed hundreds of design/build Advanced Technology Projects, utilizing our specialized expertise and in-depth understanding of these unique systems and processes. We ensure all proper protocol is followed and minimal disruption to your operations.

The following are some of our Advanced Technology projects:

  • PerkinElmer - Design/Build fast track of 17,000 SF of H-6 Occupancy Class 100 Clean Room and support facilities. The clean room was completed in 5 months. All new construction was completed without unscheduled shut-downs to existing 24x7 clean room operations.

  • Asyst Technologies - Design/Build fast track construction (6 weeks) of a new 3,000 SF Class 10 Clean Room

  • New Focus - Design/Build fast track Class 1000 Clean Room totaling 30,000 SF for manufacture and assembly of Optical Components. Project included large chiller pad and massive air-handling systems for the 30,000 SF Clean Room.

  • Nova Crystals - Design/Build new EPI Fab and Wafer Fab in an existing facility. Project included conversion of facility from B occupancy to H-6, which required a full seismic upgrade to the building.

  • Rohm 6" FAB Conversion - Design/Build renovation of 24,000 SF of H-6 Clean Room converting from 4" wafer production to 6". Included new Class 10 Clean Room, new HVAC, toxic gas alarm and monitoring systems, emergency generator, HF waste separation system, and installation of over 100 process tools.

  • Silicon Genesis Corporation - Design/Build fast track H-6 Class 10 and Class 100 Clean Rooms. Project included new AWN, scrubber and D.I. Water system, and the installation of 15 process tools. Project designed, permitted and completed in 14 weeks.

  • Silicon Microstructures - Design/Build construction of 15,000 SF of phased demolition of existing clean rooms and construction of new clean rooms including Class 100 Photo Lithography Clean Room, Etch Clean Rooms, and others. Project was fast track and included fit up of all tools.

  • Zepton Networks - Design/Build new EPI and Wafer Fab from shell. Project included seismic upgrade to 97 Code, new 3,000 SF equipment pad, new N2 and H2 bulk storage pads, new D.I. water system, scrubber, CDA, emergency power and 10,000 SF of new H-6 manufacturing area that included new Class 1000, 100 and Class 10 Clean Rooms. Project was designed, permitted and built in 5 months.

  • AMD K-6 Development Lab - Design/Build fast track construction of a new lab used for the research and development of the K-6 chip

  • Cybeq NanoTech CMP Tool Facility - Design/Build fast track construction of new Class 10 and Class 100 Clean Rooms totaling 5,000 SF. Project included humidity control, new mechanical pad with D.I. water and AWN systems, and a new 10,000 SF tool manufacturing area.

  • Infoseek Data Center – Design/Build fast track construction of a new Data Center with new HVAC systems and emergency generator.

  • Applied Materials - Building 2 Toxic Gas Ordinance retrofit and installation of 13 tools

  • Maxell CD Rom Facility - Design/Build H-6 CD Rom Manufacturing Facility known as the first of its kind in the Bay Area. Project included Mastering Room, Production Areas, AWN system and extensive building service upgrade.

 